PRICING SNAPSHOT 2026-07-11CLAUDE FABLE 5 $10.00/$50.00 MTOKCLAUDE OPUS 4.8 $5.00/$25.00 MTOKCLAUDE SONNET 5 $2.00/$10.00 MTOKCLAUDE HAIKU 4.5 $1.00/$5.00 MTOKGPT-5.6 $5.00/$30.00 MTOKGPT-5.5 $5.00/$30.00 MTOKGPT-5.4 $2.50/$15.00 MTOKGEMINI 3.1 PRO $2.00/$12.00 MTOKGEMINI 3.6 FLASH $1.50/$7.50 MTOKGEMINI 3.5 FLASH $1.50/$9.00 MTOKGEMINI OMNI FLASH $1.50/$9.00 MTOKGEMINI 3 FLASH $0.50/$3.00 MTOKGEMINI 3.5 FLASH LITE $0.30/$2.50 MTOKDEEPSEEK V4 PRO $0.43/$0.87 MTOKDEEPSEEK V4 FLASH $0.14/$0.28 MTOK
TOKENBURN_INDEX

THE TICKER · HEAD-TO-HEAD · CHECKED DAILY · LAST CHANGE 2026-07-11

GEMINI 3 FLASH VS GEMINI 3.5 FLASH LITE

Google vs Google, in USD per million tokens, verified daily against public list prices. Same jobs, both meters running.

THE VERDICT
1.2x

Gemini 3 Flash costs 1.2x more than Gemini 3.5 Flash Lite for the same job — a 1,000-token prompt with a 3,000-token reply runs $0.0095 vs $0.0078. At 1,000 runs a day, that gap is $51.00 a month for identical traffic.

SIDE BY SIDE

Gemini 3 FlashGemini 3.5 Flash Lite
VendorGoogleGoogle
Input / MTok$0.500$0.300
Output / MTok$3.00$2.50
Output multiple6.0x8.3x
1K prompt + 3K reply$0.0095$0.0078

SAME JOB, BOTH BILLS

ScenarioGemini 3 FlashGemini 3.5 Flash LiteGap
A typical prompt$0.0029$0.00231.2x
A 20-turn conversation$0.01$0.011.3x
Summarizing a 10-page document$0.01$0.011.3x
One agent run$0.04$0.031.2x
A code review request$0.01$0.00981.2x

Output sizes use the same editorial ratios as the Burn Calculator. Estimates, not invoices — and price is not a benchmark: the cheaper model is only a bargain if it does the job.

SETTLE IT WITH YOUR OWN PROMPT

Paste a real prompt into the Burn Calculator and see what it costs on Gemini 3 Flash, Gemini 3.5 Flash Lite and the other 13 models on the board — plus how much of it is waste either way.